Masjid Soleyman Dam

2 Feb 2008 12:25

Masjid Soleyman Dam
 
The history of the hydroelectric development of the Karun River dates back to 1961-1970. At that time a series of studies were carried out on the Karun River basin in order to identify the possibilities to develop this river’s water resources. Following feasibility studies in 1990, a decision was made to begin the implementation of a project build the Masjid Soleyman Hydroelectric Power Plant with a capacity of 1000 MW (which can be increased to 2000 MW).
 
 
 
The history of the hydroelectric development of the Karun River dates back to 1961-1970. At that time a series of studies were carried out on the Karun River basin in order to identify the possibilities to develop this river’s water resources. Following feasibility studies in 1990, a decision was made to begin the implementation of a project build the Masjid Soleyman Hydroelectric Power Plant with a capacity of 1000 MW (which can be increased to 2000 MW).
This project was carried out on the Karun River some 26 kilometres further down from the Karun Dam (Martyr Abbaspur).

Dam specifications:
The Masjid Soleyman Dam has the following specifications:
Height: 177 metres
Crest length: 480 metres
Capacity of the Dam body: 14 million cubic metres

Geology:
A large area of the dam and reservoir covers the Bakhtiari rock formations. The Bakhtiari formation consists of top stones consisting of a hard outer surface and very thin middle layers of clay.

Specifications of auxiliary structures:
The auxiliary structures of the Masjid Soleyman dam have the following specifications:
Spillway type: Sliding gated
-Gate type: 5 radial gate (right hand)
-Capacity: 20000 cubic metres per second
-Power plant type: Underground
-Capacity of power plant: 1000 MW (can be increased to 2000 MW)

-Name of organization /Khuzestan Dam name Masjid Soleyman
-Dam Type/ earth 
-Construction start date/ 1994
-Operation year/ 2001
- Dam location / province Khuzestan
-Closest city & distance from it/ Masjid Soleyman, 25 Km 
-Name of main river basin/ Persian Gulf
-Name of auxiliary basin Karun River ,karun
-Height from river bed/ 162 metres
- Height from foundation/ 177 metres
-Crest length/ 480 metres -Crest width /15 metres
-Width at foundation/ 700 metres 
-Power plant capacity/ 2000 MW
-Full capacity /(MCM) 230 
-Spillway type/ Free chute


Reporter : mehdi akbarsefat
َApproved by : Story Id 28
Create date : 2 Feb 2008 12:25